Chevron Makassar, Ltd.
Start date: April 22, 2021 End date: April 23, 2021
PENGUMUMAN PRAKUALIFIKASI
PREQUALIFICATION ANNOUNCEMENT
No. 6/PQ/4/2021
I. PREQUALIFICATION INFORMATION
Prequalification : Chevron Makassar, Ltd.
Address : Sentral Senayan I, Jl. Asia Afrika No. 8 Jakarta
Prequalification Title : Slickline Equipment and Wellhead Maintenance Services
Scope of Work or Specification of Goods Summary : Contractor shall be able to provide following services:
1. Slickline services, including provision of exclusive and/or call out slickline operation personnel and associated equipment such as memory production logging, simple memory production logging, downhole shut-in tools, memory gauge package, pressure control equipment, and supply of supporting parts/materials.
2. In collaboration with Company’s appointed wellhead Original Equipment Manufacturer (OEM) to provide engineering and maintenance support for West Seno Wellhead & Christmas Tree equipment, and provide spare part as required to support company operation.
II. PREQUALIFICATION REQUIREMENT AND DOCUMENT
A. Prequalification Requirement
Business Classification : Large Enterprise (Usaha Besar)
Type of Procurement : Jasa Lainnya
Company Status : - PDN
- PN
- Kons. PDN - PDN
- Kons. PDN - PN
Business Field : AKTIVITAS PENUNJANG PERTAMBANGAN MINYAK BUMI DAN GAS ALAM (KBLI 2020)
Business Subfield : - AKTIVITAS PENUNJANG PERTAMBANGAN MINYAK BUMI DAN GAS ALAM (KBLI 2020).
Minimum Threshold of Domestic Content : Tidak Berlaku / Not Applicable
Provisions for Consortium:
1. Leadfirm : In the event of Consortium, Domestic Company must act as Leadfirm of Consortium.
2. Foreign Company membership : Consortium can not be composed of Foreign Company.
3. At least one of parties in Consortium has business license as per requirement.
4. Leadfirm has to meet business classification as per requirement.
5. Business classification from all parties joined in the Consortium must not exceed requirement.
B. Prequalification Document
1. Cover Letter to participate in prequalification.
2. Valid Administration Document Replacement Certificate (SPDA) from Centralized Integrated Vendor Database (CIVD) system on the business subfield as per this announcement.
This requirement is applicable for all consortium members in the event that Bidder Candidate registers as Consortium.
In the event the consortium member is not incorporated under Indonesia law (Foreign Company), SPDA CIVD refer to requirements of Tender Executor, e.g.: Article of Incorporation, Certificate of Domicile.
3. Prequalification requirements are detailed in http://www.indonesia.chevron.com, menu "work with us -> suppliers -> tenders announcement". Only Goods/Services Provider that has valid SPDA in relevant subfield may participate in this Prequalification process.
4. Especially for Tender of Goods, in the event Bidder Candidate is appointed Agent/Distributor of domestic manufacturer, must submit evidence as Agent/Distributor from the domestic manufacturer.
III. JADWAL PRAKUALIFIKASI / PREQUALIFICATION SCHEDULE
1. Prequalification Document Submission Date : 22 Apr 2021 - 23 Apr 2021
2. Waktu : 08.00 -14.00 WIB / 8 am - 2 pm WIB (GMT+7)
3. Location : Surat Elektronik kepada: IBUTenderAnnouncementAdmin@chevron.com dan chrisvalldano@chevron.com sebagai Pihak yang Dapat Dihubungi selama Proses Prakualifikasi / IBUTenderAnnouncementAdmin@chevron.com and chrisvalldano@chevron.com as Contact Person during Prequalification Process
NOTES :
1. Submission of prequalification documents are these followings:
Name of Folder |
Document Submission |
Remarks |
Folder 1 – Admin/ Legal |
Electronic mail to Contact Person during Prequalification Process and IBUTenderAnnouncementAdmin@chevron.com |
Size of e-mail not exceed 5 MB |
Folder 2 – Technical Capability Prequalification Document |
Ariba eSourcing Event |
The Ariba eSourcing event invitation will be sent later by Prequalification Contact Person |
Folder 3 – Compliance, Financial and Information Protection Prequalification Document |
Electronic mail to Contact Person during Prequalification Process and IBUTenderAnnouncementAdmin@chevron.com |
Size of e-mail not exceed 5 MB |
Folder 4 – HES (CHESM) Prequalification Document |
Ariba eSourcing Event |
The Ariba eSourcing event invitation will be sent later by Prequalification Contact Person |
2. Participants are responsible for ensuring the submitted documents are in accordance with prequalification requirements and have been received by IBUTenderAnnouncementAdmin@chevron.com and/or Contact Person during Prequalification Process according to submission schedule. This determines the continuation of prequalification evaluation process.
IV. MISCELLANEOUS
Submission of prequalification documents listed in Folder 1 – Prequalification Requirement shall through email not exceed 5 MB. Submission of precualification document in other folders and/or further clarification will be thorugh e-mail to rpft@chevron.com (Prequalification Contract Person).
1. announcement is subject to the provisions under SKK Migas Work Procedure "No. PTK-007/SKKMA0000/2017/S0 (Revision 4) and Tender Implementation Guideline "No. EDR- 0167/SKKMH0000/2017/S7".
2. Other provisions in relation to the registration procedure shall refer to TENDER REGISTRATION PROCEDURE, which can be downloaded from the website http://www.indonesia.chevron.com, menu "work with us", submenu "suppliers", sub-submenu "tender registration procedure".
3. Only Prequalification Participants that has been declared as passed the Prequalification process will be invited to participate in the related Tender process.
4. Prequalification Participants that cannot fulfill Prequalification requirements and documents will be declared as not passed Prequalification process.
5. Registration and document submission beyond the above designated time and place is unacceptable.
Jakarta, 16 Apr 2021
PROCUREMENT