PT Paiton Energy

Start date: September 25, 2019 End date: October 18, 2019

PT Paiton Energy

REQUEST FOR PROPOSALS

General

PT Paiton Energy (“PE”), the Developer, Owner and Operator of the existing Paiton Unit 7&8 (2 x 610 MW) Power Plant located at Paiton, Probolinggo Regency is seeking proposals from Indonesian coal Producers to enter into long term supply agreements to supply coal to the existing units. In total approximately 2.5 million tonnes of sub-bituminous coal will be required per annum to support the operations of these units commencing in the year 2022 onward.

Basic Requirements

Minimum quantity to be contracted:  500,000 tonnes per year

Contract term:  5 years with option to extend up to 15 years.

Reserves:  have sufficient reserves dedicated for Paiton Units 7&8 minimum at 3,100,000 MT

Production Capacity :  > 1 million tonnes per year minimum

Pricing:  Refer to Indonesia Regulation

Delivery Point:  CIF Paiton Coal Unloading Jetty by Barge Delivery 

Basic Quality Parameters (Rejection Limits)

Parameter 

Units

Medium CV

High CV

Min

Max

Min

Max

HHV (GAR)

kcal/kg

4500

4900

4900

5600

Total Moisture

% by wt

16

35

16

32

Sizing

mm

0

75

0

75

Fines

% < 6 mm

0

45%

0

45%

Grindability

HGI

39

60

39

55

Ash (as received)

%

-

7.0

-

7 .0

Sulfur (as received)

%

-

0.40

-

0.60

AFT Initial (Reduction)

C

1050

N/A

1070

N/A

Volatile Matter (as received)

%

30

45

32

43

Na2O (dry basis)

% in ash

0

1.0

0

6.0

 

Tender documents: Tender documents can be collected at the reception area of Paiton Energy’s office between 09.00 to 17.00 until October 18th, 2019. All tenderers must submit the proposal based on the tender document. Prospective tenderers will be required to acknowledge receipt of the document. 

PT Paiton Energy

Sentral Senayan II, 5th Floor, Jl.Asia Afrika No.8, Jakarta ,10270

Contact Person:

Mr. Anwar Dasuki

Email: adasuki@paitonenergy.com