INVITATION FOR PREQUALIFICATION

Saka Indonesia Pangkah Limited and Saka Energi Muriah Limited as Contractor of Cooperation Contract (KKKS) of SKKMIGAS hereby invites goods and service providers to participate in the following Prequalification.

 BID NO & TITLE : BID-25-0011

Provision of Wellhead & X-Mas Tree Preventive Maintenance Service

 QUALIFICATION  : Small, Medium & Big Scale Company

 APPLICANT

QUALIFICATION

SMALL, MEDIUM, BIG

LOCAL CONTENT

REQUIREMENT

Min. 75 %

 ACTIVITY

SECTION/SUB

SECTION

KBLI 2020 – 6100 – PERTAMBANGAN MINYAK BUMI

KBLI 2020 – 9100 – AKTIVITAS PENUNJANG PERTAMBANGAN MINYAK

BUMI DAN GAS ALAM

 

Scope of Work:

Saka Indonesia Pangkah Limited and Saka Energi Muriah Limited has a requirement for Wellhead & Xmas Tree Inspection, Testing and Maintenance (WORK) on Wellhead Platform operation that would normally be used for Ujung Pangkah area.

These operations may include, but not limited to inspection, testing, maintenance and services of Wellhead & X-Mas Tree equipment components for COMPANY’s Wellhead and X-Mas Tree equipment by issuance of notification or Delivery Instruction Form (DIF) in call out basis to the satisfaction of COMPANY.

Work Location:

- Pangkah Block, East Java

This contract period will be twenty-four (24) months of service.

General Requirement for Registration:

Interested Applicants could register for the pre-qualification process by submitting following documents:

1. Interest Letter to participate in the Tender using Applicant letterhead complete with address, phone number, facsimile number and active email that can be contacted.

2. Valid SPDA (Surat Pengganti Dokumen Administrasi) which issued by SKKMIGAS Centralized Integrated Vendor Database (CIVD).

Schedule of Prequalification:

Detailed of pre-qualification requirements and general scope of work are provided in the Pre-qualification Document.

Applicant could register for the Prequalification Document thru email at the schedule and venue given below:

Date : 04 - 05 March 2025

Time : 09.00 - 15.00 hrs

Email to : procurement@sakaenergi.com;

cc to: novy.cahyanti@sakaenergi.com; tommy.tjia@sakaenergi.com

Email Subject : PQ Registration for BID-25-0033

This tender process is based and refer to the Pedoman Tata Kerja SKK MIGAS No. PTK.007/SKKIA0000/2023/S9 (Revisi 05 and tender guidlines no. EDR-0143/SKKIH0000/2023/S0 and only qualified applicant could participate in this Prequalification.

Jakarta, 04 March 2025

Saka Indonesia Pangkah Limited

Saka Energi Muriah Limited

Bid Committee