INVITATION FOR PREQUALIFICATION

Saka Indonesia Pangkah Limited as Contractor of Cooperation Contract (KKKS) of SKKMIGAS hereby invites goods and service providers to participate in the following Prequalification.

 BID NO & TITLE :  BID-24-0187

Provision of Fabrication, Construction and Maintenance Services for Offshore Facilities of Pangkah and Muriah Operation

 QUALIFICATION : Medium or Big Scale Company

 APPLICANT

QUALIFICATION

MEDIUM OR BIG SCALE

COMPANY

LOCAL CONTENT

REQUIREMENT

MIN. 80 %

 ACTIVITY

SECTION/SUB

SECTION

 JASA LAINNYA

 KBLI 2020 – 09100 – AKTIVITAS PENUNJANG PERTAMBANGAN MINYAK

BUMI DAN GAS ALAM

 INDUSTRI MANUFAKTUR/FABRIKASI PENUNJANG INDUSTRI MINYAK

DAN GAS

 PENGOPERASIAN DAN PEMELIHARAAN (BLASTING, PAINTING, JASA

REKAYASA TEKNIK MEKANIKAL)

 INSTALASI MINYAK DAN GAS (PERAWATAN FASILITAS PRODUKSI

LAUT, PEKERJAAN MEKANIKAL DAN FABRIKASI)

 

1. Scope of Work:

Saka Indonesia Pangkah Limited and Saka Energi Muriah Limited (COMPANY) requires CONTRACTOR to provide Provision of Fabrication, Construction and Maintenance Services for Offshore Facilities of Pangkah and Muriah Operation. such as the following but not be limited to:

• Pre-installation surveys.

• Bulk materials requisition, procurement and supplies.

• Provision of suitably qualified and experienced personnel to carry out the planning, preparation, execution, and post execution work to carry out the design, procurement, fabrications and constructions.

• Insulation works and supplies.

• Internal pressure vessel cleaning.

• Provision of consumables required for fabrications, constructions, and installations.

• Piping prefabrication with materials of construction such as carbon steel, stainless steel, duplex and or super duplex.

• Steel Structure works.

• Surface preparation, painting and coating application for piping and platform deck.

• Provision of all tools that are suitably required to support the work.

• Machining works, as necessary to complete the scope of work.

• Provision of temporary electric supply for specific works.

• Equipment hires and temporary installation as required.

• Provision of all drawings and documentation required by and result from the Work.

• New equipment installations for Plant performance enhancement.

The duration of Contract shall be Three (3) years with estimated commencement date by Q2 2025. The Point of Mobilization shall be Lamongan Shorebase, East Java.

2. General Requirement for Registration:

Interested Applicants could register for the pre-qualification process by submitting following documents:

1. Interest Letter to participate in the Tender using Applicant letterhead complete with address, phone number, facsimile number and active email that can be contacted.

2. Valid SPDA (Surat Pengganti Dokumen Administrasi) which issued by SKKMIGAS Centralized Integrated Vendor Database (CIVD).

3. Schedule of Prequalification:

Details of pre-qualification requirements and general scope of work are provided in the Prequalification Document. Applicant could register and collect the Prequalification Document via electronic mail at the schedule given below:

Date : January 7-9, 2025

Time : 09.00 - 15.00 hrs.

Place : Saka Indonesia Pangkah Limited

The Manhattan Square, 26th Floor

Jl. TB Simatupang Kav 1S

Jakarta Selatan 12560, Indonesia

Attention : procurement@sakaenergi.com with cc to Eliyas.Pattinama@sakaenergi.com

Email Subject : PQ Registration for BID-24-0187

This tender process is based and refers to the Pedoman Tata Kerja SKK MIGAS No. PTK.007/SKKIA0000/2023/S9 (Revisi-05) and tender guidlines no. EDR-0143/SKKIH0000/2023/S0 and only qualified applicant could participate in this Prequalification.

 