Mubadala Petroleum
Start date: September 10, 2019 End date: September 11, 2019
Prequalification Announcement
Mubadala Petroleum melalui afiliasinya PEARLOIL (Sebuku) Limited, mengundang Calon Peserta Tender untuk berpartisipasi dalam Prakualifikasi untuk Tender di bawah ini dengan mengacu kepada Pedoman Tata Kerja SKKMIGAS No. PTK-007/SKKMA0000/2017/S0 (Revisi 04) dan Petunjuk Pelaksanaan Tender No. EDR-0167/SKKMH0000/2017/S7 dan perubahannya (selanjutnya disebut “PTK 007”).
I. INFORMASI UMUM / GENERAL INFORMATION
1 Tender Title and Tender Number: Provision of Electric Line Logging Equipment and Services
Tender No. 10421191133
2 Business Classification: Big Enterprise
Min. Local Content: 35%
3 Business Sector : 9100 - Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam
4 Brief Scope of Work : To supply Electric Line Logging equipment and provide the associated services for offshore oil and gas drilling operations.
II. PREQUALIFICATION REGISTRATION REQUIREMENT
− Administrative Documents Replacement Certificate (SPDA) from Centralized Integrated Vendor Database (CIVD) system, which is still valid and meets the above Business Classification and Sector.
− Copy of “Provision of Drilling Fluid Products, Equipment and Engineering Services” contract for oil & gas offshore drilling operations in the last seven (7) years, at a minimum consists of the cover of contract, signature page, scope of work.
III. SCHEDULE & LOCATION
1 Registration of Prequalification: Tuesday & Wednesday
10 & 11 September 2019
09:00 – 15:00 WIB
2 Notification of Prequalification Registration Result: Thursday
12 September 2019
09:00 – 15:00 WIB
3 Collection of Prequalification Assessment Document: Friday
13 September 2019
08:30 – 11:00 WIB
4 Prequalification Clarification Meeting: Wednesday
18 September 2019
15:00 – 16:30 WIB
5 Prequalification Document Submission: Friday
19 – 20 September 2019
09.00 – 15.00 WIB
Respon Klarifikasi (melalui email) /
Clarification Response (via email)
Selasa / Tuesday
24 September 2019 / 24 September 2019
17.00 WIB
7 Prequalification Document Submission : Wednesday
02 Oktober 2019
09.00 – 15.00 WIB
8 Location: PEARLOIL (Sebuku) Limited
Pondok Indah Office Tower 2, LT 8-9
Jl. Sultan Iskandar Muda Kav. V-TA, Jakarta 12310
IV. MISCELLANEOUS
1 Prequalification can only be participated by legal entity(-ies) and not being sanctioned by the provisions under PTK 007.
2 Only Participants who passed the prequalification evaluation will be invited to participate in the tender process.
3 Prequalification document submission beyond the designated time and location above will not be accepted.
Jakarta, 9 September 2019
PROCUREMENT