Saka Indonesia Pangkah Limited

Start date: August 21, 2019 End date: August 22, 2019

Saka Indonesia Pangkah Limited

INVITATION FOR PREQUALIFICATION

Saka Indonesia Pangkah Limited as Contractors of Cooperation Contract (KKKS) of SKKMIGAS hereby invites goods and service providers to participate in the following tender.

TITLE

 

REF. NO.

LOCAL

CONTENT

REQUIREMENT

QUALIFICATION

 

ACTIVITY SECTION/

SUB SECTION

Provision of Early Site Preparation Service for West Pangkah Development

BID-19-0178

Min. 35%

Large-Scale Company

01.B.02.14 PENGERUKAN & PENGURUGAN (DREDGING & RECLAMATION)

 

Scope of Work:

Saka Indonesia Pangkah Limited (COMPANY) is the operator of Pangkah Block has requirement of service as follow:

1. Geotextile, HDPE and Fill Material Supply

2. Install Geotextile and HDPE Liner , continued with Earth Work which consisting of filling material dumping & compacting Work

Work Location

Saka Indonesia Pangkah Limited – West Pangkah Field, Near Shore East Java

The duration of contract is for 12 (twelve) months period.

General Requirement for Registration:

Interested Applicants could register for the pre-qualification process by submitting following documents:

1. Interest Letter to participate in the Tender using Applicant letterhead complete with address, phone number, facsimile number and active email that can be contacted.

2. Valid SPDA (Surat Pengganti Dokumen Administrasi) which issued by SKKMIGAS Centralized Integrated Vendor Database (CIVD).

Schedule of Prequalification:

Detailed of pre-qualification requirements and general scope of work are provided in the pre-qualification document. Applicant could register at the schedule and venue given below:

Date : 21 - 22 August 2019

Time : 09.00 - 15.00 hrs.

Place : Saka Indonesia Pangkah Limited

The Energy 11th Floor, SCBD Lot 11A

Jl. Jenderal Sudirman Kav. 52-53, Jakarta 12190

Jakarta, 21 August 2019

Saka Indonesia Pangkah Limited

Bid Committee