Mubadala Petroleum

Start date: September 10, 2019 End date: September 11, 2019

Mubadala Petroleum

Prequalification Announcement

Mubadala Petroleum melalui afiliasinya PEARLOIL (Sebuku) Limited, mengundang Calon Peserta Tender untuk berpartisipasi dalam Prakualifikasi untuk Tender di bawah ini dengan mengacu kepada Pedoman Tata Kerja SKKMIGAS No. PTK-007/SKKMA0000/2017/S0 (Revisi 04) dan Petunjuk Pelaksanaan Tender No. EDR-0167/SKKMH0000/2017/S7 dan perubahannya (selanjutnya disebut “PTK 007”).

 

I. INFORMASI UMUM / GENERAL INFORMATION

1 Tender Title and Tender Number: Provision of Drilling Fluid Products, Equipment and Engineering Services

Tender No. 10421191369

2 Business Classification: Big Enterprise

Min. Local Content: 35%

3 Business Sector

KBLI 09100 – Jasa Penunjang Pertambangan Minyak dan Gas Bumi: Jasa nonkonstruksi, jasa lainnya:

- Penelitian dan Pengembangan: Rekayasa fluida pemboran (mud engineering)

- Jasa pengelolaan limbah pemboran dan produksi

4 Brief Scope of Work

Menyediakan peralatan dan jasa rekayasa lumpur pemboran untuk kegiatan operasi pemboran minyak dan gas bumi lepas pantai. To provide drilling fluid equipment and engineering services for offshore oil and gas drilling operations.

 

II. PREQUALIFICATION REGISTRATION REQUIREMENT

− Administrative Documents Replacement Certificate (SPDA) from Centralized Integrated Vendor Database (CIVD) system, which is still valid and meets the above Business Classification and Sector.

− Copy of “Provision of Drilling Fluid Products, Equipment and Engineering Services” contract for oil & gas offshore drilling operations in the last seven (7) years, at a minimum consists of the cover of contract, signature page, scope of work.

 

III.  SCHEDULE & LOCATION

1 Registration of Prequalification:  Tuesday & Wednesday

10 & 11 September 2019

09:00 – 15:00 WIB

2 Notification of Prequalification Registration Result: Thursday

12 September 2019

15:00 – 17:00 WIB

3 Collection of Prequalification Assessment Document: Friday & Monday

13 & 16 September 2019

08:30 – 11:00 WIB

4 Prequalification Clarification Meeting:  Tuesday

17 September 2019

13:00 – 14:00 WIB

5 Prequalification Document Submission: Tuesday 1 October 2019

09.00 – 15.00 WIB

6 Location: PEARLOIL (Sebuku) Limited

Pondok Indah Office Tower 2, LT 8-9

Jl. Sultan Iskandar Muda Kav. V-TA, Jakarta 12310

 

IV. MISCELLANEOUS

1 Prequalification can only be participated by legal entity(-ies) and not being sanctioned by the provisions under PTK 007.

2 Only Participants who passed the prequalification evaluation will be invited to participate in the tender process.

3 Prequalification document submission beyond the designated time and location above will not be accepted.

 

Jakarta, 9 September 2019

PROCUREMENT