Saka Indonesia Pangkah Ltd

Start date: August 22, 2024 End date: August 26, 2024

Saka Indonesia Pangkah Ltd

INVITATION FOR PREQUALIFICATION

 

Saka Indonesia Pangkah Limited and Saka Energi Muriah Limited as Contractor of Cooperation Contract (KKKS) of SKKMIGAS hereby invites goods and service providers to participate in the following Prequalification.

BID NO & TITLE : BID-24-0171

Provision of Directional Drilling, Measurement & Logging While Drilling Services

QUALIFICATION : Big Scale Company

APPLICANT QUALIFICATION : BIG

LOCAL CONTENT REQUIREMENT : Min. 55 %

ACTIVITY SECTION/SUB SECTION : KBLI 2020 - 6100 – PERTAMBANGAN MINYAK BUMI KBLI 2020 - 6201 – PERTAMBANGAN GAS ALAM KBLI 2020 - 9100 – AKTIVITAS PENUNJANG PERTAMBANGAN MINYAK BUMI DAN GAS ALAM

1. Scope of Work:

Saka Indonesia Pangkah Limited and Saka Energi Muriah Limited (COMPANY) foresee the need to tender Directional Drilling (DD), Surveying, Measurement While Drilling (MWD), Logging While Drilling (LWD) and Gyro While Drilling (GWD) services on board Mobile Offshore Drilling Units (MODU’s) and Onshore Rig in the East Java Onshore and Offshore area. The equipment will be used for development wells but may also be used for exploration, appraisal, development drilling and potential Workovers and/or side- tracks at other locations.

Work Location :

- Pangkah Block, East Java Offshore

- Muriah Block, East Java Offshore

This contract period will be two (2) years of services.

2. General Requirement for Registration:

Interested Applicants could register for the pre-qualification process by submitting following documents:

1. Interest Letter to participate in the Tender using Applicant letterhead complete with address, phone number, facsimile number and active email that can be contacted.

2. Valid SPDA (Surat Pengganti Dokumen Administrasi) which issued by SKKMIGAS Centralized Integrated Vendor Database (CIVD).

3. Schedule of Prequalification:

Detailed of pre-qualification requirements and general scope of work are provided in the Prequalification Document. Applicant could register and collect the Prequalification Document via electronic mail at theschedule given below:

Date : 22 - 26 August 2024

Time : 09.00 - 15.00 hrs.

Place : Saka Indonesia Pangkah Limited Saka Energi Muriah Limited The Manhattan Square, 26th Floor Jl. TB Simatupang Kav 1S Jakarta Selatan 12560, Indonesia

Attention : procurement@sakaenergi.com with cc to kanamutya@sakaenergi.com

This tender process is based and refer to the Pedoman Tata Kerja SKK MIGAS No. PTK- 007/SKKIA0000/2023/S9 (Revisi-05) and tender guidlines no. EDR-0143/SKKIH0000/2023/S0 and only qualified applicant could participate in this Prequalification.

 

Jakarta, 21 August 2024

Saka Indonesia Pangkah Limited

Saka Energi Muriah Limited

Bid Committee