Mubadala Petroleum
Start date: September 04, 2019 End date: September 06, 2019
Mubadala Petroleum melalui afiliasinya PEARLOIL (Sebuku) Limited, mengundang Calon Peserta Tender untuk berpartisipasi dalam Prakualifikasi untuk Tender di bawah ini dengan mengacu kepada Pedoman Tata Kerja SKKMIGAS No. PTK-007/SKKMA0000/2017/S0 (Revisi 04) dan Petunjuk Pelaksanaan Tender No. EDR-0167/SKKMH0000/2017/S7 dan perubahannya (selanjutnya disebut “PTK 007”)
I |
INFORMASI UMUM / GENERAL INFORMATION |
||||
1 |
Judul Tender dan Nomor Tender / Tender Title and Tender Number |
Provision of 14” – 900# Class Full Structural Integrity Mechanical Smart Clamp for Phase 2 Ruby Pipeline Repair Tender No. 10421191218 |
|||
2 |
Golongan Usaha / Business Classification |
Usaha Menengah sampai Usaha Besar / Medium to Big Company |
Min. TKDN / Min. Local Content |
Tidak dipersyaratkan |
|
3 |
Kategori Barang / Catogory of Goods |
Non APBN |
|||
4 |
Bidang Usaha / Business Sector |
465 – Perdagangan Besar Mesin, Peralatan dan Perlengkapannya |
|||
466 – Perdagangan Besar Khusus Lainnya |
|||||
5 |
Ruang Lingkup Kerja Singkat / Brief Scope of Work |
Company requires Service Provider to a proven solutions and experienced in detail engineering design, manufacturing and installation supervisory staff in order to design, deliver and install one (1) 14 in – 900# Class diver installable Full Structural Integrity Mechanical Clamp for subsea pipeline dent and bend repair system. |
|||
II |
PERSYARATAN PENDAFTARAN PRAKUALIFIKASI / PREQUALIFICATION REGISTRATION REQUIREMENT |
||||
|
Sertifikat Pengganti Dokumen Administrasi (SPDA) dari sistem Centralized Integrated Vendor Database (CIVD) yang masih berlaku dan sesuai dengan Golongan Usaha dan Bidang Usaha di atas. |
||||
III |
JADWAL & LOKASI / SCHEDULE & LOCATION |
||||
1 |
Pendaftaran Prakualifikasi / Registration of Prequalification |
Rabu - Jumat / Wednesday - Friday |
|||
04 - 06 September 2019 / 04 - 06 September 2019 |
|||||
09.00 - 16.00 WIB |
|||||
2 |
Pemberitahuan Hasil Pendaftaran Prakualifikasi / Notification of Prequalification Registration Result |
Senin / Monday |
|||
09 September 2019 / 09 September 2019 |
|||||
09.00 - 16.00 WIB |
|||||
3 |
Pengambilan Dokumen Penilaian Prakualifikasi / Collection of Prequalification Assesment Document |
Selasa - Rabu / Tuesday - Wednesday |
|||
10 - 11 September 2019 / 10 - 11 September 2019 |
|||||
09.00 - 16.00 WIB |
|||||
4 |
Penyerahan Dokumen Prakualifikasi / Prequalification Document Submission |
Rabu / Wednesday |
|||
18 September 2019 / 18 September 2019 |
|||||
09.00 - 15.00 WIB |
|||||
5 |
Lokasi / Location |
PEARLOIL (Sebuku) Limited |
|||
Pondok Indah Office Tower 2, LT 8-9 |
|||||
Jl. Sultan Iskandar Muda Kav. V-TA, Jakarta 12310 |
|||||
IV |
LAIN-LAIN / MISCELLANEOUS |
||||
1 |
Penilaian Prakualifikasi hanya dapat diikuti oleh perusahaan (-perusahaan) yang berbadan hukum dan tidak terhalang kepesertaannya berdasarkan ketentuan dalam PTK 007. / Prequalification can only be participated by legal entity(-ies) and not being sanctioned by the provisions under PTK 007. |
||||
2 |
Hanya Calon Peserta Tender yang dinyatakan lulus penilaian prakualifikasi yang akan diundang untuk mengikuti proses tender. / Only Participants who passed the prequalification evaluation will be invited to participate in the tender process. |
||||
3 |
Pemasukan Dokumen Prakualifikasi di luar waktu dan tempat yang ditentukan diatas tidak akan diterima. / Prequalification document submission beyond the designated time and location above will not be accepted. |
||||
Jakarta, 03 September 2019
PENGELOLA PENGADAAN / PROCUREMENT COMMITTEE