Chevron Makassar, Ltd.
Start date: January 12, 2021 End date: January 13, 2021
PENGUMUMAN PRAKUALIFIKASI
PREQUALIFICATION ANNOUNCEMENT
No. 1/PQ/1/2021
I. PREQUALIFICATION INFORMATION
Prequalification : Chevron Makassar, Ltd.
As the potential user of goods/services as well as Prequalification Executor, acting for and on behalf of :
Chevron Makassar, Ltd.
Chevron Rapak, Ltd.
Address : Sentral Senayan I, Jl. Asia Afrika No. 8 Jakarta
Prequalification Title : Flexible Pipeline Annulus Integrity Assessment
Scope of Work or Specification of Goods Summary : Service
Pengetesan annulus untuk pipa fleksibel dan/atau jumper yang terpasang di fasilitas-fasilitas operasi Perusahaan (Chevron Makassar Ltd. dan/atau Chevron Rapak, Ltd.) sesuai dengan standard-standard industri terbaru dan/atau spesifikasi-spesifikasi seperti API 17B Recommended Practice for Flexible Pipeline dan/atau API 17J Specification for Unbounded Flexible Pipeline. (Prakualifikasi Ulang dari Prakualifikasi No. 1/PQ/12/2020)
II. PREQUALIFICATION REQUIREMENT AND DOCUMENT
A. Prequalification Requirement
Business Classification : Medium Enterprise (Usaha Menengah) atau Large Enterprise (Usaha Besar)
Company Domicile Requirement : Not Applicable
Type of Procurement : Consultation Services (Jasa Konsultansi)
Company Status : - PDN
- PN
- Kons. PDN - PDN
- Kons. PDN - PN
Business Field : (42) KONSTRUKSI BANGUNAN SIPIL; (71) AKTIVITAS ARSITEKTUR DAN KEINSINYURAN, ANALISIS DAN UJI TEKNIS; (91) AKTIVITAS PENUNJANG PERTAMBANGAN MINYAK BUMI DAN GAS ALAM; (4659) PERDAGANGAN BESAR MESIN, PERALATAN, DAN PERLENGKAPANNYA; (2) PERENCANAAN REKAYASA; (12) KONSULTANSI KONSTRUKSI;
Business Subfield : (429) KONSTRUKSI BANGUNAN SIPIL LAINNYA; (711) AKTIVITAS ARSITEKTUR DAN KEINSINYURAN SERTA KONSULTASI TEKNIS; (712) ANALISIS DAN UJI TEKNIS; (KL409) REKAYASA TERPADU; (712) PENGUJIAN DAN ANALISIS TEKNIS; (4659) PERDAGANGAN BESAR MESIN, PERALATAN DAN PERLENGKAPAN LAINNYA; (RE106) JASA DESAIN REKAYASA UNTUK PROSES INDUSTRIAL DAN PRODUKSI; (RE108) JASA DESAIN REKAYASA LAINNYA
Minimum Threshold of Domestic Content : Not Applicable
Provisions for Consortium:
1. Leadfirm : In the event of Consortium, Domestic Company must act as Leadfirm of Consortium.
2. Foreign Company membership : Consortium can not be composed of Foreign Company.
3. At least one of parties in Consortium has business license as per requirement.
4. Leadfirm has to meet business classification as per requirement.
5. Business classification from all parties joined in the Consortium must not exceed requirement.
B. Prequalification Document
1. Cover Letter to participate in prequalification.
2. Valid Administration Document Replacement Certificate (SPDA) from Centralized Integrated Vendor Database (CIVD) system on the business subfield as per this announcement.
This requirement is applicable for all consortium members in the event that Bidder Candidate registers as Consortium.
In the event the consortium member is not incorporated under Indonesia law (Foreign Company), SPDA CIVD refer to requirements of Tender Executor, e.g.: Article of Incorporation, Certificate of Domicile.
3. Prequalification requirements are detailed in http://www.indonesia.chevron.com, menu "work with us -> suppliers -> tenders announcement". Only Goods/Services Provider that has valid SPDA in relevant subfield may participate in this Prequalification process.
4. Especially for Tender of Goods, in the event Bidder Candidate is appointed Agent/Distributor of domestic manufacturer, must submit evidence as Agent/Distributor from the domestic manufacturer.
III. JADWAL PRAKUALIFIKASI / PREQUALIFICATION SCHEDULE
Prequalification Document Submission Date : 12 Jan 2021 - 13 Jan 2021
Waktu / Time : 08.00 – 14.00 / 8 am - 2 pm WIB
Location : Surat Elektronik kepada: IBUTenderAnnouncementAdmin@chevron.com dan chrisvalldano@chevron.com sebagai Pihak yang Dapat Dihubungi selama Proses Prakualifikasi / IBUTenderAnnouncementAdmin@chevron.com and chrisvalldano@chevron.com as Contact Person during Prequalification Process
NOTES :
1. Penyerahan dokumen prakualifikasi adalah sebagai berikut/ Submission of prequalification documents are these followings:
Name of Folder |
Document Submission |
Remarks |
Folder 1 – Admin/ Legal |
Electronic mail to Contact Person during Prequalification Process and IBUTenderAnnouncementAdmin@chevron.com |
Size of e-mail not exceed 5 MB |
Folder 2 – Technical Capability Prequalification Document |
Ariba eSourcing Event |
The Ariba eSourcing event invitation will be sent later by Prequalification Contact Person |
Folder 3 – Compliance, Financial and Information Protection Prequalification Document
|
Electronic mail to Contact Person during Prequalification Process and IBUTenderAnnouncementAdmin@chevron.com |
Size of e-mail not exceed 5 MB |
Folder 4 – HES (CHESM) Prequalification Document |
Ariba eSourcing Event |
The Ariba eSourcing event invitation will be sent later by Prequalification Contact Person |
2. IBUTenderAnnouncementAdmin@chevron.com Participants are responsible for ensuring the submitted documents are in accordance with prequalification requirements and have been received by and or Contact Person during Prequalification Process according to submission schedule. This determines the continuation of prequalification evaluation process.
IV. Lain-lain / Miscellaneous
1. announcement is subject to the provisions under SKK Migas Work Procedure "No. PTK-007/SKKMA0000/2017/S0 (Revision 4) and Tender Implementation Guideline "No. EDR- 0167/SKKMH0000/2017/S7".
2. Other provisions in relation to the registration procedure shall refer to TENDER REGISTRATION PROCEDURE, which can be downloaded from the website http://www.indonesia.chevron.com, menu "work with us", submenu "suppliers", sub-submenu "tender registration procedure".
3. Only Prequalification Participants that has been declared as passed the Prequalification process will be invited to participate in the related Tender process.
4. Prequalification Participants that cannot fulfill Prequalification requirements and documents will be declared as not passed Prequalification process.
5. Registration and document submission beyond the above designated time and place is unacceptable.
Jakarta, 08 Jan 2021
PROCUREMENT